Asoenergía: power restrictions add $504,000 million a month to Colombian costs

EconomyLatin America

Asoenergía estimates a net extra cost of $504,000 million a month for Colombian demand from preventive measures to secure power supply. The restrictions component rose from about $10 to $164 per kWh; in November it stayed near $160 per kWh.

The measures, in place since September, aim to protect reservoir water levels and manage risks linked to El Niño. They rely more on thermal generation, which the association says also raises final tariffs. Asoenergía asked the Creg to review the measures adopted.

Summary written by AI from the articles below. Check the details in the original sources.

Follow this story in Telegram — the bot will send follow-ups and key updates

Involved: Colombia Asoenergía Creg

Replies

The discussion is just starting. Share what you think about this story.

Reply to the thread

Without signing in, the message is marked “guest”. A registered member’s nickname can’t be used without their phrase. Sign in

0/4000 Image: use the “image” button or a direct Imgur file link

Similar stories

  1. Bogota power rationing risk rises as demand nears outstripping supply

What outlets report 1

↑ Top